|
CLIENT
|
FIELD / FACILITY
|
PEL’S SCOPE/ PROJECT BRIEF
|
DATE
COMP’TED
|
CLIENT’S CONTACT ENGINEER FOR REFERENCE
|
|
Midwestern Oil & Gas
|
Kwale
|
Umusadge Flow Station Engineering Design & Project
Management Services
|
April 2009
|
Peter Idowu
Tel: 234-1-2715183
E-mail:
idowu.peter@midwesternog.com
|
|
CAMERON / TOTAL
|
Usan Field
|
Detailed Design of Subsea Manifold for Usan Field
Development Project
|
On-going
|
Steve Lokett
Tel: +44 (0)7809756907
E-mail:
Steve.Lockett@c-a-m.com
|
|
Afren Energy Resources
|
Okoro
|
Personnel Support Services and Orifice Size Verification
|
November 2008
|
Gordon Mearns
Tel: 234-702 839 2668
E-mail:
gordon.mearns@amnipetroleum.com
|
|
Baywood
|
Port Harcourt
|
Detailed Design for Shell I. A. MOP Fuel Gas Pipeline
Upgrade
|
August 2008
|
Chris baywood Ibe
Tel: +234 1
4970646
|
|
ADDAX
|
Oron Wellhead Platform
|
Oron Wellhead Structural Analysis
|
April 2008
|
Emeka Onyeagba
Tel: +234 1 2705265-7 Ext. 5706
|
|
SPDC
|
Port Harcourt
|
NCTL Temporary Debottlenecking Studies
|
December 2008
|
Smart Ogbulie
E-mail:
smart.ogbulie@shell.com
|
|
Dorman Long
|
Lagos
|
Conceptual Design of Early Production Facility for Uquo
Field
|
March
2008
|
Livinus Onuh
E-mail:
livinusonuh@dormanlongeng.com
|
|
ADDAX
|
Adanga Platform
|
Adanga SW 18H Structural Analysis & Deck Design
|
August 2008
|
Emeka Onyeagba
Tel: +234 1 2705265-7 Ext. 5706
|
|
NDPR
|
Multi-locations
|
Detailed Design for 12” x 20km (Ogbelle – Rumuji
Pipeline) Project
|
May 2009
|
Femi Olaniyan
|
|
Dorman Long
|
Lagos
|
Personnel Support Service
|
January
2008
|
Chris Ijeli
E-mail:
chrisijeli@dormanlongeng.com
|
Page 1 of 5
All Rights Reserved:Copyright©2011. Point Engineering Limited.

To prove a POINT for indigenous participation in the Nigerian Oil and Gas Sector by providing complete; quality assured engineering services capable of satisfying the most stringent requirements of our clients wherever it is required using the best available technical skills.
OUR VISION IS:
OUR MISSION IS:
To be a reference POINT in turning Engineering Concepts into Reality in the Nigerian Oil and Gas Sector.